{ "id": "RS21488", "type": "CRS Report", "typeId": "REPORTS", "number": "RS21488", "active": false, "source": "EveryCRSReport.com, University of North Texas Libraries Government Documents Department", "versions": [ { "source": "EveryCRSReport.com", "id": 307521, "date": "2005-08-29", "retrieved": "2016-04-07T19:33:13.855029", "title": "Navy-Marine Corps Tactical Air Integration Plan: Background and Issues for Congress", "summary": "The Department of the Navy (DON) in 2003 began implementing a Navy-Marine Corps Tactical\nAir\nIntegration (TAI) plan aimed at more closely integrating Navy and Marine Corps strike fighter\ninventories. DON said the plan will reduce strike fighter procurement costs by about $35 billion,\nbut increase strike fighter readiness costs by about $16.5 billion, resulting in a net savings of about\n$18.5 billion. DON in June 2005 modified the TAI plan to respond to increased operational tempo. \nThe TAI plan raises several potential oversight issues. This report will be updated as events\nwarrant.", "type": "CRS Report", "typeId": "REPORTS", "active": false, "formats": [ { "format": "HTML", "encoding": "utf-8", "url": "http://www.crs.gov/Reports/RS21488", "sha1": "163384fc3fa513c2207fc67bb9787e6086e025d1", "filename": "files/20050829_RS21488_163384fc3fa513c2207fc67bb9787e6086e025d1.html", "images": null }, { "format": "PDF", "encoding": null, "url": "http://www.crs.gov/Reports/pdf/RS21488", "sha1": "606c70861144fdcef241fbdacee8824af438766e", "filename": "files/20050829_RS21488_606c70861144fdcef241fbdacee8824af438766e.pdf", "images": null } ], "topics": [] }, { "source": "University of North Texas Libraries Government Documents Department", "sourceLink": "https://digital.library.unt.edu/ark:/67531/metacrs5706/", "id": "RS21488 2003-04-10", "date": "2003-04-10", "retrieved": "2005-06-12T18:35:49", "title": "Navy-Marine Corps Tactical Air Integration Plan: Background and Issues for Congress", "summary": null, "type": "CRS Report", "typeId": "REPORT", "active": false, "formats": [ { "format": "PDF", "filename": "files/20030410_RS21488_3aa197d30e03eaf45e9455cb6af4834865b895ff.pdf" }, { "format": "HTML", "filename": "files/20030410_RS21488_3aa197d30e03eaf45e9455cb6af4834865b895ff.html" } ], "topics": [ { "source": "LIV", "id": "Weapons systems", "name": "Weapons systems" }, { "source": "LIV", "id": "Fighter aircraft - Defense procurement", "name": "Fighter aircraft - Defense procurement" }, { "source": "LIV", "id": "Public contracts", "name": "Public contracts" }, { "source": "LIV", "id": "Defense economics", "name": "Defense economics" } ] } ], "topics": [] }